2007 – NHS Children’s Hospital, London (Cardiac Unit). Electrical installation of generator control system and switchgear for 2000kVA standby generator
2006 – NHS Hospital, Surrey. Electrical installation of 2x1000kVA Mains-paralleling generators and associated control system.
2005 – Polo Pitch, Wigborough. Design and installation of floodlighting.
2005 – Power Station, St Mary, Scilly Isles. Installation of internal lighting in 33m exhaust stack.
2004/5 – Office complex, Ilminster. Electrical installation for business park.
2004 – HM Prison, Cambridgeshire. Electrical installation of 1500kVA generator and associated control and switchgear.
2004 – Food Processing Factory, Beaminster. Electrical installation of process control plant.
We have also carried out work at many prisons, hotels, factories etc, as well as carrying out domestic work locally.
|